BDA
Elevated corridor work begins on Ballari Road
Image: Deccan Herald- Type
- Infrastructure · Road
- Where
- Ballari Road, Bangalore
- Reported
- 5 November 2026
BDA has taken up elevated corridor work on Ballari Road, bringing traffic curbs for 18 months.
WHERE IT LANDS
WHAT IT MEANS
Lokazen’s read- For brands & retailers
Retailers on Ballari Road could face weaker drive-by access during 18 months of traffic curbs; visible frontage and pedestrian access will matter more.
- For businesses
Offices on Ballari Road could see longer employee and visitor journeys while the elevated-corridor work and traffic curbs continue.
- For investors & landlords
Ballari Road assets could face near-term leasing friction from access constraints during construction, despite potential longer-term corridor benefits.
Compare Ballari Road sites with pedestrian access and frontage that can remain usable during the 18-month works.
Lokazen’s analysis of this report and our location data. A guide for choosing locations, not investment advice.
Looking at Ballari Road?
Lokazen maps the brands already trading in Bangalore and the spaces you can lease now.
MORE MOVES
- Bengaluru Suburban RailRail
To remove 5 level crossings
Bangalore - Bengaluru MetroMetro
Conducts Blue Line train trial run at Byappanahalli depot
Byappanahalli depot, Bangalore - Bengaluru South CityCivic
Opens first streetlight control room in Jayanagar
Jayanagar, Bangalore - CabinetRoad
Clears 10 Bengaluru road packages
Bangalore - Karnataka CabinetRoad
Approves additional funding for Bengaluru road project
Bangalore - NHAIRoad
Implements road-safety measures at two airport highway junctions
Byatarayanapura and Kodigehalli junctions, Bangalore